• About
  • Advertise
  • Our Privacy Policy
  • Contact
Friday, September 4, 2026
No Result
View All Result
  • Login
  • Register
MetrowatchXtra
  • WORLD
  • BUSINESS
  • POLITICS
  • HEALTH
  • SPORTS
  • OP-ED
  • ENTERTAINMENT
  • WORLD
  • BUSINESS
  • POLITICS
  • HEALTH
  • SPORTS
  • OP-ED
  • ENTERTAINMENT
No Result
View All Result
MetrowatchXtra
No Result
View All Result
Home Latest News

Nigerian Govt Announces 2 Weeks Closure of First Niger Bridge 

The closure comes after last week’s visit by the Minister of Works, Dave Umahi, who inspected a vandalised section of the bridge, where bolts and iron rods had been stolen by scavengers

Kemi Sheriepha by Kemi Sheriepha
September 4, 2026
0 0
0

The Federal Ministry of Works, Anambra State Field Headquarters, has officially announced the closure of the First Niger Bridge in Onitsha to commence repair works.

The closure comes after last week’s visit by the Minister of Works, Dave Umahi, who inspected a vandalised section of the bridge, where bolts and iron rods had been stolen by scavengers.

An official press release by the ministry’s field office in Anambra, signed by the State Controller, Mr Timothy Emenike, noted that the bridge would be closed for two weeks, starting Monday, 7 September 2026.

The release read: “The attention of the general public, motorists and other road users is hereby drawn to the deteriorated condition of the First Niger Bridge, Onitsha, particularly the carriageway surface and certain bridge components affected by vandalism, including portions of the expansion joint steelworks and stanchion/steel truss nuts and bolts.

“During his recent working visit to Anambra State, the Minister of Works, David Nweze Umahi, expressed concern over the condition of the bridge and directed the immediate commencement of emergency maintenance and rehabilitation works to restore the facility to a safe and properly motorable condition.

READ ALSO  Elections: Actress Mercy Johnson's Husband Wins Edo Reps’ Seat

Accordingly, Messrs SKECC, the contractor handling the Km 0+000 to Km 20+000 section of the Onitsha-Enugu Dual Carriageway, has been directed to immediately commence emergency maintenance works on the First Niger Bridge.

“The First Niger Bridge will be fully closed to traffic from Monday, 7” September 2026, and the emergency maintenance works are expected to be completed by Monday, 21st September 2026. In view of the nature and urgency of the intervention, motorists and other road users are hereby advised and directed to use the Second Niger Bridge route through Obosi towards Asaba, Delta State and other destinations beyond, throughout the closure period.

“Appropriate traffic diversion arrangements, road signs, safety barriers, traffic-control personnel and other necessary safety measures will be deployed to guide motorists and ensure the safety of road users, construction personnel and other members of the public.

“Motorists are strongly advised to obey all temporary traffic signs and diversion instructions, approach the construction and diversion zones with caution, reduce speed and avoid reckless overtaking.”

READ ALSO  Adamawa Guber Poll: Stop This ‘Show of Shame’, PDP Govs’ Slam INEC | METROWATCH

The ministry said part of the work to be done on the bridge includes milling and removal of the existing deteriorated asphalt surfacing, laying of approximately 40mm asphalt wearing course and necessary associated maintenance and safety works on the bridge.

Also, the maintenance will include the installation of solar-powered streetlights and closed-circuit television, CCTV, cameras to monitor the activities of vandals on the bridge, installation and deployment of appropriate traffic-control and diversion measures with the objective to ensure safety, smooth driving and significantly reduce the traffic difficulties currently experienced around the First Niger Bridge axis.

The ministry said the work will be done day and night to ensure speed. It apologised for the inconvenience the closure will cause businesses and road users, promising to strengthen the integrity of the bridge for the safety of all.

 

Metrowatchxtra

Tags: First Niger Bridge
Kemi Sheriepha

Kemi Sheriepha

RELATED POST

No Content Available
Load More

APO

Recent Posts

  • Boko Haram Terrorists Ambush APC Guber Candidate Convoy in Borno
  • Nigerian Govt Announces 2 Weeks Closure of First Niger Bridge 
  • 2027: Tinubu Will ‘Eat Obi Like Biscuits’ if he Runs Alone, Okonkwo Says
  • El-Rufai Planned Killing of Our People in Southern Kaduna, Defence Minister Musa Declares 
  • 2027: I’m Ready to Die Protecting my Vote, no More Intimidation, Says Peter Obi

Recommended

Hours After Deadly Abuja Explosion, Another Truck Overturns Near Karu Bridge

Hours After Deadly Abuja Explosion, Another Truck Overturns Near Karu Bridge

1 year ago
Sam Amadi

Supreme Court Determined Presidential Election Result because INEC Failed, Says Sam Amadi | METROWATCH

2 years ago
MetrowatchXtra

MetrowatchXtra is an online daily newspaper poised to act as a catalyst in our debate and desire for well-governed Nigeria and provide the much-needed platform for all, irrespective of social, religious or political divide, to express their views.
Metrowatchxtra Nigeria

  • About
  • Advertise
  • Our Privacy Policy
  • Contact

© 2026 Metrowatchxtra Nigeria Published by Miraculous Media Connect Limited. All rights reserved

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Politics
  • World
  • Business
  • Science
  • Entertainment
  • Sports
  • Tech
  • Health

© 2026 Metrowatchxtra Nigeria Published by Miraculous Media Connect Limited. All rights reserved